Types:
2 units of HRSG
Capacity:
250 t/hr
Press/Temp:
125 barg/ 528 C
Fuels:
Natural Gas
Capacity:
60 t/hr
Major Materials:
Drums: SA 516 Grade 70

Waterwalls: N/A

Module Size:
(HWL)
2 Modules of 5.5×3.9×19.4 m

@ 105 tonnes

2 Modules of 4.9×3.3×18.9 m

@ 102 tonnes

Total Weight:
642 tonnes

THE CHALLENGES

RCR Energy Pty., Ltd. is a leading Australian multi-faceted engineering company focused on Mining, Resources, Energy and Power industries. From 2005, BIB has manufactured over 80% of RCR boilers in the market and has since established a long standing working relationship with RCR. This project was a collaboration between BIB and our sister company, Vatana Phaisal Engineering Co., Ltd.. With Vatana Phaisal’s fabrication abilities and our specialisation in manufacturing pressure vessels, the four modules making up the two units were manufactured and elivered to the site in just 8 months.

Heat Recovery Steam Generator enabled waste energy to be collected and turned into electricity, resulting in a more economical solution for our client. The key success in this project was BIB’s ability to deliver quality at a competitive price and time schedule. At BIB, all of our products are designed and manufactered according to full ASME section 1 code, additionally this project recieved the prestige ASME S stamps at the request of the client.

Categories:
Client:RCR Energy
Location:Sriracha, Thailand
Completed:March, 2015
Industry:Petrochemical
Release Date:August, 2014

BIB Scope: Design AND Erection

  • Pressure Parts
  • Non Pressure Parts
  • Refractory
  • Detail Shop Drawing
  • Code Stamp
  • Export Packaging
  • Finish Painting
  • Fabrication Parts
  • Fully Assembly

FEATURES AND BENEFITS

  • 8 months from Award to Delivery
  • This boiler was fully manufactured, tested and stamped in accordance with ASME section I Boiler & Pressure Vessel Code, satisfying this specific End User requirement.
  • BIB’s Manufacturing & Quality processes can accommodate unique client requirements.  For this project, the materials had been pre-ordered by the client to improve schedule
  • Holes to within strict tolerances of +0.05 / -0 mm to enable a smooth assemby and successful hydrotest