PROJECT Gallery

PROJECT DETAIL

Type:
Bi-Drum Watertube Boiler
Rating:
47 MWt
Capacity:
75 t/hr
Combustion:
Vibrating Grate
Press/Temp:
41 barg/254oC
Fuels:
Natural Gas
Major Material:
Drums: SA 516 Grade 70

Waterwalls: SA192

Application:
Process Steam

THE CHALLENGES

RCR is a leading multi-faceted engineering company focused on Mining, Resources, Energy and Power industries. From 2005, BIB has manufactured over 80% of RCR boilers in the market and has since established a long standing working relationship with RCR. Fonterra is a co-operative New Zealand producer of milk and dairy products responsible for over 22 billion litres of milk annually, whereby the high quality of steam produced by BIB boiler is an integral part in the company’s  processing lines. BIB is internationally assured and manufacturing was performed according to AS 1228 code in order to adhere to the New Zealand standard of practice.

The key success in this project was our skilled worker team coupled with BIB’s management expertise which enabled the fully assembled boiler to be completed in just 6 months, significantly reducing the site erection costs for our client.

Categories:
Client:RCR Energy
Location:Lichfield, New Zealand
Completed:November, 2015
Industry:Dairy Industry
Release Date:May, 2015

BIB Scope: Design AND Erection

  • Pressure Parts
  • Non Pressure Parts
  • Refractory
  • Detail Shop Drawings
  • Code Stamp
  • Export Packaging
  • Finish Painting
  • Fabrication Parts
  • Full Assembly

FEATURES AND BENEFITS

  • 8 months from Award to Delivery
  • This boiler was fully manufactured, tested and stamped in accordance with ASME section I Boiler & Pressure Vessel Code, satisfying this specific End User requirement.
  • BIB’s Manufacturing & Quality processes can accommodate unique client requirements.  For this project, the materials had been pre-ordered by the client to improve schedule
  • Holes to within strict tolerances of +0.05 / -0 mm to enable a smooth assemby and successful hydrotest