Fuels:
Palm Fibre, EFB, Palm Shell

& Biogas

Rating:
38.4 MWt / 6.2 MWe
Technology:
Single-Drum
Combustion:
Air Cooled Vibrating Grate
Capacity:
42 t/hr
Press/Temp:
60 barg / 480oC
Blr Efficiency:
~ 86% LHV
Process Steam:
42 t/hr @ 60 barg / 480 degree
Emissions:
NOx/SOx < 180/54 ppm

CO <332 mg/nm3

PM <100 mg/m3

 

THE CHALLENGES

Chumporn Palm Oil Industry Public Company (CPI) is a major manufacturer of palm oil in Thailand, while its sister company CPP focuses on palm oil refinery and energy production. To reduce material wastage and fossil fuels consumption, CPP generates energy from biomass and biogas. While fuels from palm processing were readily available, the company used an anaerobic wastewater management system to produce supplementing biogas, which does not only reduce CO2 emission but it also decreases methane emission, resulting in an economical, efficient and eco-friendlier system. The key to BIB’s success in this project was the ability to handle both biomass and biogas fuels. EFB  is especially difficult to burn due to its high moisture content, low ash melting point and low heating value. The boiler was specifically designed to match these fuels, at the same time enabled high efficiency to be achieved. The steam produced in turn was used in the refinery process while the excess electricity was sold.

PROJECT DETAIL

Categories:
Client:CPP CO.,LTD
Location:Prachuap Khiri Khan, Thailand
Completed:November, 2016
Release Date:September, 2015
Application:Cogeneration

BIB Scope: Design AND Erection

  • Boiler Island
  • Heat Recovery
  • Feedwater Delivery
  • Fuel Delivery
  • Ash Handling
  • Pollution Control
  • Instruments & Controls
  • Dosing & Blowdown
  • Sampling & Analyzing
  • Platforming & Steelwork
  • Electrical Work

FEATURES AND BENEFITS

  • Utilisation of otherwise wasted biomass & biogas
  • Eco-Friendly: Neutral Carbon Cycle
  • Avoid Sensitivity to global fossil fuel cost fluctuations
  • Reduced Plant Fuel & Electricity costs through integrated process & power plant design using controlled extraction.
  • Easily Achievable superheat temperature
  • High Thermal Efficiency potential
  • Safe Operation and enhanced metered controls
  • Fast Start up & Ramping
  • 20+ year design life
  • Very Low Maintenance & Good Longetivity
  • Good Fuel Flexibility with Excellent Operator Adjustment
  • Simple to Operate with high Availability.